by canneppwpuser | Nov 8, 2021 | PACKAGED BOILER HOUSES
The requirement for two 10MW steam plants for Rio Tinto Alcan in Kitimat turned into a unique and exciting design build opportunity for CANNEPP. The two “twin” plants were engineered and constructed at our manufacturing facility in Delta BC. Once complete, shop tested...
by canneppwpuser | Nov 8, 2021 | PACKAGED BOILER HOUSES
The need for a shippable oil fired water/glycol heating plant to “top off” the power generator heat recovery system was the perfect solution for adding to the development of this mine site. The 6MW plant was designed as two modules: one containing two 300 HP...
by canneppwpuser | Nov 8, 2021 | PACKAGED BOILER HOUSES
As a long time equipment and service provider Diavik looked to CANNEPP to Waste oil collected from the power generators, trucks and other machinery must be carefully handled to prevent adverse environmental impact and to ensure work place safety. For locations such as...
Recent Comments